Filtered categories:
The maximum pressure in the sprinkler system shall not exceeds 350 PSI at any location in the system. Sprinkler systems can be zoned to avoid exceeding such pressure.
Was this helpful?
A building plan checker reviews most grading plans. The grading plan checker will review grading plans for grading work in conjunction with an approved subdivision map or to issue grading permits to correct a hazardous soil condition per LABC 7005.7.
Was this helpful?
Building verification is required after all other division clearances have been obtained.
Was this helpful?
In apartment buildings, when carpet is installed in an assembly meeting the STC 50 requirement.
Was this helpful?
A Certificate of Occupancy is required for new buildings, additions, change of use or occupancy.
Was this helpful?
Commissioning report is required for all new non-residential projects of 10,000 square feet or more. The exceptions are warehouses, open parking garages and similar projects.
Was this helpful?
When the customer decides not to use anti graffiti coating on the first 9 feet of the exterior of the building.
Was this helpful?
When required by the engineer or indicated on the approved plans.
Was this helpful?
When there are higher stresses in the structural design.
Was this helpful?
When all wallboard has been installed and nailed or screwed in.
Was this helpful?