Filtered categories:
If it is a building code issue, you may file a request for modification. Please refer to the Request for Modification (Mod.00) form for reference. In approving such a request, the Department needs to determine that the slight modification is reasonably equivalent to the ordinance requirement involved, that a special individual reason makes the strict letter of the ordinance impractical, and that the slight modification is in conformity with the spirit and purpose of the Code involved.
If the request is denied by the Department, it may be appealed to the Board of Building and Safety Commissioners.
If it is a Planning Code issue, this Department can only review and act on items stipulated in Section 12.26, specifically, yard variances not exceeding 20% of the required yard and parking facility design as published in Sec. 12.21A5. (Reprint from Planning Code Section 12.26). All other request for changes from the Planning Code shall be filed with the Planning Department.
Was this helpful?
You need to file for a Clerical Modification approval. You need to perform the following steps:
Was this helpful?
Addition of a model to an existing approval requires submittal of Technical Modification. You need to perform the following steps:
Was this helpful?
The steps are the same as regular approval, as follows:
Submit the following:
However, the revised approval may require a new model designation of the previous product and the approval would be for the duration that was originally established for the equipment.
Was this helpful?
Current product literature, owner’s manual, schematic wiring diagrams and parts list, installation instruction (if applicable), and a production sample of the equipment with all the options and accessories.
Was this helpful?
The permit number, address, owner, description of work, A&E occupancy load, and signature.
Was this helpful?
An approved recognized electrical testing agency is a testing agency that obtains approval from the Department of Building and Safety to perform testing and listing and field evaluation. A list of these recognized testing agencies are posted on the LADBS web as follows on the "Electrical Test Lab (ETL)" page:
Was this helpful?
All construction work for which a permit is required shall be subject to inspection by authorized inspectors. An inspection must be performed before work is concealed or covered. It is your responsibility to notify the inspector when the work is ready for inspection. Work is generally inspected and approved in succession and no work may continue beyond the point indicated in each successive inspection without first obtaining the approval of the inspector.
Common items to be inspected are foundation excavations, concrete work, wood framing, ventilation equipment, plumbing, electrical, shear wall nailing, roof nailing etc. When completed, there shall be a final inspection and approval of the completed project.
Was this helpful?
The purpose for which a building, or part of a building, is used or intended to be used.
Was this helpful?
It is an order to correct a code violation.
Was this helpful?