Adaptive Reuse Projects
Adaptive Reuse refers to the process of reusing an old site or building for a purpose other than which it was built or designed for.
About Adaptive Reuse
The City’s Adaptive Reuse Program works by streamlining the process developers must follow to get their projects approved, resulting in substantial time saving.
"The City’s Adaptive Reuse Program's first component, a set of land use ordinances, relaxes parking, density, and other typical zoning requirements. Through fire and life safety measures, the Program’s second component provides flexibility in the approval and permitting process." (excerpt from the City of Los Angeles Adaptive Reuse Program book)
Additional Resources
- Related Documents
Filtered categories:
Supplemental Plan Check Correction Sheet for Structural Design - General (2023 LABC)
PC/STR/Corr.Lst.104-2023
Supplemental Plan Check Correction Sheet for Two-way Concrete Slab (2017 LABC)
PC/STR/Corr.Lst.045-2017
Supplemental Plan Check Correction Sheet for Two-way Concrete Slab (2020 LABC)
PC/STR/Corr.Lst.045-2020
Supplemental Plan Check Correction Sheet for Two-way Concrete Slab (2023 LABC)
PC/STR/Corr.Lst.045-2023
Supplemental Plan Check Correction Sheet for Unreinforced Masonry (URM) Retrofit (2017 LABC)
PC/STR/Corr.Lst.053-2017
Supplemental Plan Check Correction Sheet for Unreinforced Masonry (URM) Retrofit (2023 LABC)
PC/STR/Corr.Lst.053-2023
Supplemental Plan Check Corrections Sheet for 2016 Building Energy Efficiency Standards
PC/STR/Corr.Lst.102-2016
Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013)
PC/STR/Corr.Lst.111-2017
Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013)
PC/STR/Corr.Lst.111-2017
Supplemental Plan Check Corrections Sheet for Fire District 1 and Very High Fire Hazard Severity Zone (2017 LABC)
PC/STR/Corr.Lst.109-2017