Permits for simple projects, which do not require plan check, are readily issued as Express Permits or e-permits when done online.
All contractors must complete a subcontractor form providing information on any subcontractors used on the project. This form must be returned to the Office of Finance
Filtered categories:
No. The design of the equipment can be reviewed, but the approval can only be issued after satisfactory evaluation and testing of the equipment.
Was this helpful?
The LADBS-ETL offers three different types of approvals:
Was this helpful?
Building permit fees are calculated based on the valuation of the project. Please refer to the Los Angeles City Building Code section 91.107 , or Contact Us at 3-1-1 for assistance.
Was this helpful?
Different types of approval are: Laboratory Approval, Field One-Time Approval, and General Approval
Was this helpful?
Monday 7:30 AM - 4:30 PM
Tuesday 7:30 AM - 4:30 PM
Wednesday 9:00 AM - 4:30 PM
Thursday 7:30 AM - 4:30 PM
Friday 7:30 AM - 4:30 PM
Was this helpful?
Per the Los Angeles Zoning Code construction hours are 7:00 AM to 9:00 PM on weekdays, and 8:00 AM to 5:00 PM on Saturdays.
Was this helpful?
The inspection counter hours are from 7:00 AM to 4:30 PM, Monday through Friday.
Was this helpful?
Was this helpful?
The flow and pressure requirements are 250 GPM at 100 PSI when PRV is not required, and 250 GPM at 125 PSI when PRV is required.
Was this helpful?