Filtered categories:
Standard plans are intended to serve as a base design that has already been reviewed by the Department of Building and Safety for Building Code Compliance. However, each property is unique, and modifications / customizations to a pre-approved standard plan may be necessary. Any customization of a pre-approved standard plan must be completed by the plan’s owner. Please note that design changes may result in additional costs and could result in additional permitting review timelines, as revised portions of the plan will require City review.
Was this helpful?
One-time Approval. This approval is granted for fixtures and equipment that are custom made or installed at a specific job site. The evaluation and testing can often be performed at the location where the fixture/equipment is installed. Application for this type of approval may be filed by the building owner, installer, vendor, or manufacturer. The approval is for one time and for a specific location, and it cannot be used for another installation.
General Approval/Laboratory Approval. This approval is granted for fixtures and equipment to be used anytime and anywhere within the City. The testing and physical evaluation are usually done in an approved laboratory, unless a suitable site visit is prearranged. Application for this type of approval shall be filed by the manufacturer.
Was this helpful?
all
Was this helpful?
one
Was this helpful?
Was this helpful?
must
Was this helpful?
Was this helpful?
Was this helpful?
When you receive an Order To Comply (OTC) stating that your property violates Code, read the order carefully to identify which items:
The current property owner is responsible for complying with the Order, even if previous owners or tenants have performed the un-permitted work or created the violation.
Refer to the Obtaining Permits to Resolve Orders (.pdf) information bulletin for more detail.
Was this helpful?
The property owner must hire an engineer or architect licensed in the state of California to evaluate the strength of the building. The engineer or architect must then develop plans for the building’s seismic strengthening in compliance with this program. The owner must notify tenants in writing per HCIDLA regulations.
Was this helpful?