“ASHRAE Guideline 0.2-2015 Commissioning Process for Existing Systems and Assemblies”
requires the following items as part of Retro-Commissioning:
Definitions:
CFR: Current Facility Requirements
EBCx: Existing-Building Commissioning
M&V: Measurement and Verification
OCx: Ongoing Commissioning
O&M: Operation and Maintenance
Was this helpful?
”ASHRAE Guideline 0.2-2015 Commissioning Process for Existing Systems and Assemblies” requires the following items as part of the Audit:
Was this helpful?
The BBSC consists of five citizens appointed by the Mayor and confirmed by the City Council. The BBSC is granted the authority, by the Los Angeles Municipal Code (LAMC) and by the City Charter, to hear many kinds of appeals related to Building ordinances.
Read more about the BBSC.
Was this helpful?
The minimum size of an efficiency unit is 220 square feet, plus a code compliant closet and bathroom; however, the Ordinance does not specify any minimum square footage requirements for an ADU or JADU, except for Movable Tiny Houses (MTHs). This provision refers to any other current or future zoning ordinances that would prohibit an efficiency unit ADU
Was this helpful?
Once you have your plans ready for submittal, you can submit them through our Eplan portal using the address '1 Standard Plan Way'. Please include in the work description, 'ADU Standard Plan Program: X-Story, X-bedroom(s) with options. (XXX sf)'. You will need to submit plans for each unit you are proposing.
Was this helpful?
The evaluation time frame is based on the complexity of the product. Contact the Engineering Research Section for the current status. The process to obtain a Los Angeles City Research Report consists of the following steps:
Was this helpful?
The evaluation time frame is based on the complexity of the product. Contact the Building Research Section for the current status.
The process to obtain a Los Angeles City Research Report consists of the following steps:
Was this helpful?
The Zoning Code Manual and Commentary PDF is an interpretation of the Zoning code. It is a useful tool to answer more specific questions regarding Zoning.
Was this helpful?
Was this helpful?
For a complete listing of building permit submittal requirements, please refer to the Building Permit Checklist.
Was this helpful?
Eaves: Project into the required side yard not more than 4 inches for each foot of width of such side yard, provided the width of the side yard is not reduced to less than 30 inches. Project into the required front and rear yards not more than 30 inches. Project into the side yard adjoining the street lot line of a corner lot not more than 30 inches, provided the width is not reduced to less than 30 inches.
Open roof and unenclosed trellis
Open, unenclosed stairways or balconies not covered by a roof or canopy: Project into a required rear yard not more than 4 feet. Project into a required front yard 30 inches. Project into the side yard adjoining a street lot line of a corner lot, not more than 30 inches, provided the width is not reduced to less than 30 inches.
Open, unenclosed porches, platforms, or landing places (including access stairways) not covered by a roof or canopy which does not extend above the level of the first floor of the building, provided: Projection is maximum 6 feet into the required front, side, and rear yards Projection is maximum 6 feet above adjacent grade.
Chimney: Project into the required front, side, and rear yards not more than 2 feet. The width of the required side yard shall not be reduced to less than 3 feet.
A bay window or garden type window of normal size may project 8 inches into a required side yard, provided the width of the required side yard is not reduced to less than 3 feet.
Tankless water heaters may project 18 inches into the required side yard, provided such side yard is not reduced to less than 3 feet in width.
The following roof structures are allowed to project above the like-for-like height limit:
Stairway housing (no larger than 72 square feet) may project 5 feet.
Elevator housing may project 5 feet, provided it is setback a minimum of 5 feet from the roof perimeter.
Chimneys may project 5 feet.
Was this helpful?
The proposed conversion will be subject to all zoning code and fire sprinkler regulations in place at the time of the proposed change of use. If the ADU or JADU was constructed within an existing building, non-conforming rights from the building and use that existed prior to the ADU or JADU may be considered at the discretion of LADBS.
Was this helpful?
Public Record Act Requests to the Department of Building and Safety (LADBS) may include a wide variety of Departmental documents and materials (including print, photographic, and electronic formats) that were created or obtained by the department and are, at the time the request is filed, in the department's care and custody. The Public Records Act excludes certain categories of records from disclosure.
Please be advised that some LADBS documents are available in electronic format and can be obtained online from the Departments Official Document Repository, the LADBS Internet Document Imaging System (IDIS) here:
Search Online Building Records
Other documents that are not available online, but are indexed in IDIS can be obtained through the LADBS Public Records Counter by submitting a Research Request Form available here:
Forms and Publications - Service Requests
Copies of Building Plans (Blueprints) are also obtained through the LADBS Public Records Counter by submitting a Research Request Form.
Was this helpful?
The BBSC is granted the authority by the Code and by the City Charter, to hear many kinds of appeals, including but not limited to the following:
Was this helpful?
Automobile parking is not required for ADUs created within an existing or proposed main home or an existing accessory structure. ADU parking may be required if the ADU exceeds the existing square footage of an existing main home (primary residence) or accessory structure, as well as for a newly constructed detached ADU. Other parking waivers in LAMC Section 12.22 A.33(c)(12)(i) may also apply.
Was this helpful?
As of June 9, 2025, LADBS will start accepting applications using the process shown in the Implementation Guidelines.
Was this helpful?
Generally, an appeal to the BBSC is scheduled for a hearing date within thirty days of receipt of the appeal to the BBSC. This time period will be extended in cases that require additional documentation and/or research. In the case of import/export applications, the scheduled hearing date is contingent upon receipt of the appropriate environmental clearance from the Department of City Planning (i.e. Categorical Exemption, Mitigated Negative Declaration, or Environmental Impact Report) AND responses from the Department of Transportation and the Department of Public Works.
Was this helpful?
Anyone may initiate a request for public records.
Was this helpful?
Yes. Other agency reviews and clearance requirements may still apply depending on your individual site conditions.
Was this helpful?
While the Pre-Approved Standard Plan Program streamlines the building and safety review process, other agency/departmental reviews and clearances may still be required depending on your specific site conditions and type of rebuild. Homeowners should be prepared to obtain additional approvals as part of the permitting process.
Was this helpful?
Waiting for Soft-Story Content
Was this helpful?
LAMC requires that notices are sent to other property owners that may be affected by the request when an appeal request is submitted to the BBSC. You may attend the hearing and are allowed to speak on any case on the agenda, by completing a speaker card on the day of the hearing.
Was this helpful?
No. The design of the equipment can be reviewed, but the approval can only be issued after satisfactory evaluation and testing of the equipment.
Was this helpful?