Custodian of Records
Anyone can initiate a request to Public Records. It may include a wide variety of documents and materials (including print, photographic, and electronic formats) that were created or obtained by the LADBS.
About the Program
The California State Legislature adopted the Public Records Act in 1968. It is designed to give the public access to information in the possession of public agencies. The Act also provides that public records shall be open for inspection during regular office hours of the agency. The public can inspect or receive a copy of any record unless the record is exempted from disclosure under the act.
Additional Resources
- FAQ
FAQ Search Results
Filtered categories:
All
No. The design of the equipment can be reviewed, but the approval can only be issued after satisfactory evaluation and testing of the equipment.
Was this helpful?
The LADBS-ETL offers three different types of approvals:
- Laboratory Approval – This approval is intended for mass produced electrical products by manufacturers.
- Field One-Time Approval – This approval is intended for field installed products that may be one of a kind or a modified mass produced product. This type of approval is limited to the field conditions, intended for a specific job address.
- General Approval – This approval is intended for products that may have code violations, have no recognized national safety standards to test to, or tested only to manufacturer standards. This approval may be for mass produced products, one of kind products, or for a job at a specific address. This approval may be referred to as “Research Report”.
Was this helpful?
Building permit fees are calculated based on the valuation of the project. Please refer to the Los Angeles City Building Code section 91.107 , or Contact Us at 3-1-1 for assistance.
Was this helpful?
Different types of approval are: Laboratory Approval, Field One-Time Approval, and General Approval
Was this helpful?
Monday 7:30 AM - 4:30 PM
Tuesday 7:30 AM - 4:30 PM
Wednesday 9:00 AM - 4:30 PM
Thursday 7:30 AM - 4:30 PM
Friday 7:30 AM - 4:30 PM
Was this helpful?
Per the Los Angeles Zoning Code construction hours are 7:00 AM to 9:00 PM on weekdays, and 8:00 AM to 5:00 PM on Saturdays.
Was this helpful?
The inspection counter hours are from 7:00 AM to 4:30 PM, Monday through Friday.
Was this helpful?
- Monday 7:30 AM - 4:30 PM
- Tuesday 7:30 AM - 4:30 PM
- Wednesday 9:00 AM - 4:30 PM
- Thursday 7:30 AM - 4:30 PM
- Friday 7:30 AM - 4:30 PM
- Monday 7:30 AM - 4:30 PM
- Tuesday 7:30 AM - 4:30 PM
- Wednesday 9:00 AM - 4:30 PM
- Thursday 7:30 AM - 4:30 PM
- Friday 7:30 AM - 4:30 PM
Was this helpful?
The flow and pressure requirements are 250 GPM at 100 PSI when PRV is not required, and 250 GPM at 125 PSI when PRV is required.
Was this helpful?