The California State Legislature adopted the Public Records Act in 1968. It is designed to give the public access to information in the possession of public agencies. The Act also provides that public records shall be open for inspection during regular office hours of the agency. The public can inspect or receive a copy of any record unless the record is exempted from disclosure under the act.
Additional Resources
- FAQ
FAQ Search Results
Filtered categories:
All
Please see Section 403.7 of the Los Angeles Mechanical Code (LAMC) for the requirements concerning garage ventilation systems.
Was this helpful?
Refer to section 8604.6.5 of LABC.
Was this helpful?
The rules and regulations of LADBS-ETL are provided in Information Bulletin P/EC 2014-005.
Was this helpful?
The steps of an ePlanLA application are:
1. Submit Application for Screening
2. Application Review
3. Plan Check
4. Corrections Issued
5. Plan Check Complete
6. Permit Issued
Was this helpful?
Within two (2) years after the service date of the Order to Comply, a structural analysis and plans to either retrofit or demolish, or proof of previous retrofit shall be submitted to the Department for review if the building meets the minimum requirements of this ordinance.
2
Within three-and-a-half (3 ½) years after the service date of the Order to Comply, obtain all permits for retrofit or demolition of the building.
3 ½
Within seven (7) years after the service date of the Order to Comply, complete construction or demolition work and finalize permits.
7
Was this helpful?
Within two (2) years after the service date of the Order to Comply, a structural analysis and plans to either retrofit or demolish, or proof of previous retrofit shall be submitted to the Department for review if the building meets the minimum requirements of this ordinance.
2
Within three-and-a-half (3 ½) years after the service date of the Order to Comply, obtain all permits for retrofit or demolition of the building.
3 ½
Within seven (7) years after the service date of the Order to Comply, complete construction or demolition work and finalize permits.
7
Was this helpful?
Any permit that qualifies as an express permit may be obtained online.
Was this helpful?
An application for the Electrical Test Lab (ETL) may be submitted for evaluation.
Was this helpful?
All major critical components in the equipment need to be recognized and/or listed by a City of Los Angeles recognized testing laboratory.
Was this helpful?
Alterations to an existing building must be provided with an accessible path of travel to the specific area of alteration. This includes the primary entrance to the building or facility, toilet or bathing facilities serving the area, drinking fountains, public telephones, and signs.
Was this helpful?