What is the Occupancy Load?
In A and E occupancies the occupant load is required on the CofO for the number of people allowed.
In A and E occupancies the occupant load is required on the CofO for the number of people allowed.
The issuance fee is $453.00.
Work that is less than $500.00 in valuation.
A point measured from the lowest adjacent grade to a point at the top of the building.
The purpose for which a building, or part of a building, is used or intended to be used.
Per the Los Angeles Zoning Code construction hours are 7:00 AM to 9:00 PM on weekdays, and 8:00 AM to 5:00 PM on Saturdays.
It is an order to correct a code violation.
If the customer misplaces the permit, then yes. For department errors, there is no fee.
The Description describes the type of work that will be performed.
The cost is $137.80 for a TSE permit.