You need to file for a Clerical Modification approval. You need to perform the following steps:
Was this helpful?
Addition of a model to an existing approval requires submittal of Technical Modification. You need to perform the following steps:
Was this helpful?
The steps are the same as regular approval, as follows:
Submit the following:
However, the revised approval may require a new model designation of the previous product and the approval would be for the duration that was originally established for the equipment.
Was this helpful?
Current product literature, owner’s manual, schematic wiring diagrams and parts list, installation instruction (if applicable), and a production sample of the equipment with all the options and accessories.
Was this helpful?
The permit number, address, owner, description of work, A&E occupancy load, and signature.
Was this helpful?
An approved recognized electrical testing agency is a testing agency that obtains approval from the Department of Building and Safety to perform testing and listing and field evaluation. A list of these recognized testing agencies are posted on the LADBS web as follows on the "Electrical Test Lab (ETL)" page:
Was this helpful?
All construction work for which a permit is required shall be subject to inspection by authorized inspectors. An inspection must be performed before work is concealed or covered. It is your responsibility to notify the inspector when the work is ready for inspection. Work is generally inspected and approved in succession and no work may continue beyond the point indicated in each successive inspection without first obtaining the approval of the inspector.
Common items to be inspected are foundation excavations, concrete work, wood framing, ventilation equipment, plumbing, electrical, shear wall nailing, roof nailing etc. When completed, there shall be a final inspection and approval of the completed project.
Was this helpful?
The purpose for which a building, or part of a building, is used or intended to be used.
Was this helpful?
It is an order to correct a code violation.
Was this helpful?
Plan check is when your building plans are reviewed to make sure they comply with basic safety, engineering and planning rules. LADBS plan check engineers will review the design of such things as the structure, plumbing and electrical systems to make sure they are safe and properly designed. They will also look at other items, like building setbacks, heights and lot coverage to see that the construction is compatible with the neighborhood.
Plan check is part of the permit process. If your project disqualifies you from directly receiving an Express Permit, you will need to have a plan check. If it's a small project, a Counter Plan Check will suffice. If it's a large project, you might need to have a Regular Plan Check, where your plans are submitted and reviewed over the period of several weeks.
Was this helpful?
A prevailing setback is a calculation used to determine minimum distance construction can be from the front property line, essentially a front yard measurement. An online Yard Setback Information File is provided to assist in determining this complex calculation.
Was this helpful?
A Range File is a Code Enforcement Violation.
Was this helpful?
A soft-story building is a structure which has a weaker first floor and is unable to carry the weight of the stories above during an earthquake. The first floor generally would have large openings in the perimeter walls such as garages, tuck under parking or even large windows.
Was this helpful?
A soft-story building is a structure which has a weaker first floor and is unable to carry the weight of the stories above during an earthquake. The first floor generally would have large openings in the perimeter walls such as garages, tuck under parking or even large windows.
Was this helpful?
UL Standard is an Underwriters Laboratories standard used as the basis of evaluation and testing of equipment.
Was this helpful?
Turning space shall be a circular space of 60” diameter, or a T-shaped space with a 60” length for arms width, and a base that is 36” wide. See 11B-304.3.2.
Was this helpful?
Also known as an Online Permit or Express Permit, e-permit is a service we provide to expedite less complex permit types.
Obtain permits on our website through Online Services or see a list of available online permits on our Express Permit page.
Was this helpful?
ePlanLA, short for Electronic Plan Review Los Angeles, is an online service for submitting plans for plan check, applying for permits, and tracking the progress of these applications. Plans submitted must be scaled pdf drawings. Plan review and correspondence will be done through the online service.
Was this helpful?
"Extra Inspection Trip Payment" is an online service offered by LADBS to provide its customers the capability to pay extra inspection trip fees via the e-Permit system, when an inspection is scheduled but cannot be performed due to customer error.
Customers can pay for "Extra Inspection Trip" fees through Online Services.
Was this helpful?
All construction work for which a permit is required shall be subject to inspection by authorized inspectors. It is your responsibility to notify the inspector when the work is ready for inspection.
Work is generally inspected and approved in succession and no work may continue beyond the point indicated in each successive inspection without first obtaining the approval of the inspector.
Common items to be inspected are foundation excavations, concrete work, wood framing, shear wall nailing, etc. When completed, there shall be a final inspection and approval of the completed project.
Was this helpful?
Was this helpful?
LARR stands for "Los Angeles Research Reports." LADBS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety. Approved materials are published as LARR.
Was this helpful?
You can then appeal any determination with respect to the Zoning code to the Department Of the City Planning. See the Information Bulletin P/ZC 2023-019 for more information.
Was this helpful?
Plan check is a process of which the plans are reviewed for compliance to current codes. For this program, the plans will be reviewed for compliance to the mandatory retrofit ordinance 183983 and 184081. Once plans have been reviewed and approved, permit can be issued.
Was this helpful?