In general, four years, unless there is a change in the scope of work or adoption of a new LABC.
Was this helpful?
A General Approval/Laboratory Approval is valid for one year from the approval date.
Was this helpful?
The general and laboratory approval is good for 12 months. The product approval letter indicates the duration and expiration date of the approved product.
One-time approval is good for the duration where the equipment is installed, provided that the equipment is not modified or relocated to another location in or outside of the building or facility.
Was this helpful?
The process time depends on the current backlog and type of application submitted. Contact the Mechanical Test Lab Engineer for more information. You may find test lab contact information on our Mechanical Test Lab page.
Was this helpful?
The amount time needed to check a plan will vary week to week based on the day's backlog at the time of submittal. You may ask any available staff about the current backlog and a time estimate.
Was this helpful?
Regular: 5 to 6 weeks. Expedite: 4 to 5 weeks.
Was this helpful?
5% minimum is required.
Was this helpful?
2% of the dwelling units. If parking is assigned, then 2% of the assigned parking spaces must be accessible. If unassigned, then a minimum of 5% of parking spaces must be accessible.
Was this helpful?
DA parking stalls must be provided in accordance with Table 11B-208.3.
Was this helpful?
Minimum 5% of the seating spaces for dining surfaces must be accessible and dispersed within other types of seating located in the functional area.
Was this helpful?
Addition of 3 or more newly-constructed units will trigger DA requirements.
Was this helpful?
A single family zone only allows one house. You will need to obtain a variance from the Department of the City Planning for any additional dwelling unit on your property.
Was this helpful?
Depending on the project, there could be one or as many as needed to complete the project.
Was this helpful?
One inspector for building, electrical, plumbing, HVAC, grading, and green. Separate for Fire Sprinkler.
Was this helpful?
Minimum of 5% must be in compliance.
Was this helpful?
1 in 6 DA parking stalls required by Table 11B-208.3 must be a van stall.
Was this helpful?
Each house is required to have 2 parking spaces. The two-car parking spaces shall be covered, if the house is in a single family zone.
Was this helpful?
You can obtain one combined permit for the addition which covers the electrical, plumbing, HVAC, etc. work. However, a separate Sprinkler permit is required if the house needs to be sprinklered throughout due to the addition and remodeling.
Was this helpful?
We only need one set of plans for plan review. Upon plan approval, you will need to provide two sets of final plans.
Was this helpful?
Maximum two residential heads shall be hydraulically calculated for the design criteria listed in section 10.2.1 of NFPA 13D.
Was this helpful?
Based on the height district and the type of construction, the building can be single-story to unlimited.
Was this helpful?
A permit is valid for two years from the time the permit fees are paid. Each permit extension is good for 6-month within the two years limit.
Was this helpful?
For elevator buildings, all units on floors served by the elevator must be accessible. For non-elevator buildings, all ground floor units must be accessible.
Was this helpful?
Was this helpful?
Fees are $550.00 for failure to comply within 15 days of the compliance date.