Filtered categories:
Call 3-1-1 to find out the current status of your plan check.
Was this helpful?
Please see Information Bulletin P/BC 2014-057 for details.
Was this helpful?
The Description describes the type of work that will be performed.
Was this helpful?
A modification is issued/processed by LADBS. A variance is handled by the Department of City Planning, when a project is not a by-right project.
Was this helpful?
According to Electrical Code article 100, an equipment or material that is tested by an approved testing agency meeting appropriate designated standards are considered as listed equipment, provided that also, the testing agency publishes a list of these products and the product bears the listing mark or logo of the testing agency.
Electrical equipment that is evaluated and tested by the City of Los Angeles Electrical Test Lab conforming to the requirement of the adopted standards and codes are considered as approved equipment.
Was this helpful?
General or laboratory approval is generally for identical mass produced equipment with a one-year approval time, after which a re-evaluation would be required for another one-year period, if the applicant would like to maintain approval.
One-Time approval is for field installed product(s) at a specific location. The approval for the product is limited to the location in which it's installed, but no annual renewal is required, as is the case of general approval.
Was this helpful?
A Title 24, Part 6 plan check is only for California state energy regulation compliance of indoor or outdoor lighting, desegregation and monitoring of electrical loads, and distribution equipment or service(s). The regular plan check involves building and premises wiring systems and may include Title 24, Part 6 energy regulation plan check.
Was this helpful?
The cost can range anywhere from 10¢ (cents) per page to $1.50 per page.
Was this helpful?
The cost is $137.80 for a TSE permit.
Was this helpful?