Filtered categories:
A soils report is needed for construction on a slope steeper than 3:1 (Horizontal:Vertical), excavations removing lateral support, when a structure cannot be designed per building code values, and/or for structures which do not conform to chapter 18 of the 2014 LABC. Reports are also required for sites in seismic hazard zones that are not exempt under Information Bulletin P/BC 2014-044.
Was this helpful?
Floor control valves and waterflow detection assemblies shall be installed at each floor where any of the following occur:
Was this helpful?
You will need a Haul Route hearing if your property is within LA City Special Grading Area, and you are exporting more than 1,000 cubic yards of dirt from your property. See the Information Bulletin P/BC 2014-134, available at LADBS.ORG.
Was this helpful?
Any new restaurant or any tenant improvement of a restaurant will require approval by the LA County Health Department before a corresponding building permit can be issued. Any place where food is processed requires approval from LA County Health Department. See the Information Bulletin P/GI 2010-005 for more information.
Was this helpful?
Please call LAFD at (213) 482-6900 for the information.
Was this helpful?
Any permit other than Express Permits or the online permits require plans. For the list of the Express Permits, check the corresponding Information Bulletin.
Was this helpful?
Whenever a building is demolished, a Demo Pre-Inspection (DPI) is required. See the Information Bulletin P/BC 2014-039 available on LADBS.ORG for more information.
Was this helpful?
Most of the signs except wall signs, under certain conditions, require a Sign Pre-Inspection (SPI) report. See the Information Bulletin P/BC 2014-078 for more information.
Was this helpful?
Call for initial inspection after HVAC is installed and ducts sealed and prior to drywall installation.
Was this helpful?