Filtered categories:
When there is a City Planning Case requiring a landscape Architect.
Was this helpful?
An AQMD clearance letter is required whenever there is a "Yes" answer to any of the questions on the AQMD "Air Quality Permit Checklist". The AQMD clearance letter will be required before a Certificate of Occupancy is issued. For more information, please call 1-800-CUT-SMOG.
Was this helpful?
An AQMD clearance is required for charbroilers spray booth, dry cleaning, motor fuel storage, ETC.
Was this helpful?
Projects that utilizes higher stresses require the Architect or Engineer to submit the form.
Was this helpful?
When work performed and materials used are required to comply with Title 24 Energy Regulations.
Was this helpful?
When all framing has been approved.
Was this helpful?
Permits are issued for many different types of work, including Building, Electrical and Plumbing just to name a few. Please visit each our Plan Review & Permit page for more information about when a permit is required.
If you have a specific question on whether the work you are performing requires a permit, please feel free to call 3-1-1 for further assistance.
Was this helpful?
A plumbing permit is required for the installation of any gas piping, except piping less than 6 feet in length between an existing gas outlet and a gas appliance in the same room.
Was this helpful?
When clearance for the plumbing is required.
Was this helpful?
A reroof certificate is required for existing building in which the roof is replaced or repaired.
Was this helpful?