Category
How long do I have to wait for a Sign Pre-Inspection (SPI) to be completed?
It normally takes minimum of two weeks for a Sign Pre-Inspection (SPI) to be completed.
It normally takes minimum of two weeks for a Sign Pre-Inspection (SPI) to be completed.