Skip to main content
Category

What do I need to apply for Demolition Pre-Inspection (DPI) report?

A plot plan showing the location of each building to be demolished. Specify the number of the story(s), the use, the floor area, and the distance of each building from the property lines. See the Information Bulletin P/BC 2023-039 for more information.