A grading bond is required for projects with over 250 CY of cut or fill in a Hillside Grading Area.
Question label
When do I need to post a grading bond?
Category
Mark as Popular
No
A grading bond is required for projects with over 250 CY of cut or fill in a Hillside Grading Area.