Skip to main content
Displaying 41 - 50 of 125 results
Procedures for the Application of ASCE 41-22 to Existing Buildings
IB/P/BC 2026-148
Published:
Effective Date:
       
Accessory and Junior Accessory Dwelling Units / Permitted & Unpermitted Buildings
IB/P/BC 2026-150
Published:
Effective Date:
       
Liquefaction Analysis Guideline
IB/P/BC 2026-151
Published:
Effective Date:
       
Structural Design Guidelines for Non-Ductile Concrete Buildings
IB/P/BC 2026-152
Published:
Effective Date:
       
Data Collection, Material Testing and Condition Assessment Requirements for Existing Concrete Buildings
IB/P/BC 2026-153
Published:
Effective Date:
       
30-Day Notification of Intent to Excavate
IB/P/BC 2026-060
Published:
Effective Date:
       
Guidelines for Determining Remedial Grading Exempted from the Baseline Hillside Ordinance
IB/P/BC 2023-139
Published:
Effective Date:
       
Wood Frame Prescriptive Provisions One Story Residential Construction Only
IB/P/BC 2026-004
Published:
Effective Date:
       
Foundation Design for Expansive Soils
IB/P/BC 2026-116
Published:
Effective Date:
       
Accessibility Details for Doors, Maneuvering Spaces and Routes
IB/P/BC 2026-086
Published:
Effective Date: