Skip to main content
Displaying 31 - 40 of 49 results
Wood Frame Prescriptive Provisions One Story Residential Construction Only
IB/P/BC 2026-004
Published:
Effective Date:
       
Foundation Design for Expansive Soils
IB/P/BC 2026-116
Published:
Effective Date:
       
Retaining Wall Design
IB/P/BC 2026-083
Published:
Effective Date:
       
Site Testing Standards for Methane
IB/P/BC 2023-101
Published:
Effective Date:
       
Guidelines for Storm Water Infiltration
IB/P/BC 2026-118
Published:
Effective Date:
       
Controlled Low Strength Material (CLSM)
IB/P/BC 2026-121
Published:
Effective Date:
       
Exemptions from Liquefaction, Earthquake Induced Landslide, and Fault-rupture Hazard Zone Investigations
IB/P/BC 2026-044
Published:
Effective Date:
       
Slope Stability Evaluation and Acceptance Standards
IB/P/BC 2026-049
Published:
Effective Date:
       
Construction Upon Slopes Steeper Than Two Horizontal to One Vertical
IB/P/BC 2026-050
Published:
Effective Date:
       
Drainage Across Lot Property Line
IB/P/BC 2026-057
Published:
Effective Date: