What happens if my equipment does not pass the evaluation?
A letter of correction will be issued, either asking for additional information or indicating what tests or evaluations did not pass and may necessitate changes or modifications to the equipment.
What information do you need at the time of application submittal?
Current product literature, owner’s manual, schematic wiring diagrams and parts list, installation instruction (if applicable), and a production sample of the equipment with all the options and accessories.
LARR stands for "Los Angeles Research Reports." LADBS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
What is the difference between the "General" and "One-Time" approval?
General or laboratory approval is generally for identical mass produced equipment with a one-year approval time, after which a re-evaluation would be required for another one-year period, if the applicant would like to maintain approval.
What type of electrical equipment requires approval from the City of Los Angeles Department of Building and Safety (LADBS)?
All electrical equipment sold, installed or advertised for sale in the City of Los Angeles shall be approved by the LA Department of Building and Safety (LADBS).