Skip to main content
Displaying 201 - 210 of 603 results
What information is required on a Certificate of Occupancy?

The permit number, address, owner, description of work, A&E occupancy load, and signature.

Published:
    Read FAQ
What is an Occupancy?

The purpose for which a building, or part of a building, is used or intended to be used.

Published:
    Read FAQ
What is an Order to Comply?

It is an order to correct a code violation.

Published:
    Read FAQ
What is the Description of Work?

The Description describes the type of work that will be performed.

Published:
    Read FAQ
What is the fees for a special event permit?

The cost is $137.80 for a TSE permit.

Published:
    Read FAQ
What is the height of the building?

A point measured from the lowest adjacent grade to a point at the top of the building.

Published:
    Read FAQ
What is the issuance fee for a TCO?

The issuance fee is $453.00.

Published:
    Read FAQ
What is the Occupancy Load?

In A and E occupancies the occupant load is required on the CofO for the number of people allowed.

Published:
    Read FAQ
What is the price per occupancy of the TCO?

For A, E, I, H, B, the fees are $98.00 per floor and R2 occ $189.00 per floor.

Published:
    Read FAQ
What is the square footage of this building?

The measurement of the length times the width of the structure.

Published:
    Read FAQ