Skip to main content
Displaying 41 - 50 of 603 results
How do I find a Contractor?

Please visit the Contractors State License Board for information regarding hiring a contractor and to verify if a contractor is licensed and insured: http://cslb.ca.gov.

 

Published:
    Read FAQ
What do I do next?

Submit proof of previous retrofit, plans to retrofit, or plans to demolish to the Department of Building and Safety. Plans and calculations will be checked for compliance with the retrofit ordinance.

Published:
    Read FAQ
What are the time limits to comply?

Within two (2) years after the service date of the Order to Comply, a structural analysis and plans to either retrofit or demolish, or proof of previous retrofit shall be submitted to the Department for review if the building meets the minimum requirements of this ordinance.

Published:
    Read FAQ
What do I do after a permit is issued?
Published:
    Read FAQ
What should I submit to LADBS for plan check and obtain a permit?

The documents required for submittal are:

Published:
    Read FAQ
What is plan check?

Plan check is a process of which the plans are reviewed for compliance to current codes. For this program, the plans will be reviewed for compliance to the mandatory retrofit ordinance 183983 and 184081. Once plans have been reviewed and approved, permit can be issued.

Published:
    Read FAQ
What is inspection?

All construction work for which a permit is required shall be subject to inspection by authorized inspectors. It is your responsibility to notify the inspector when the work is ready for inspection. 

Published:
    Read FAQ
How do I schedule for inspection?

To request for inspection, please call (888) LA4Build or request for inspection online.

 

Published:
    Read FAQ
What is required to take into consideration for Retro-Commissioning?

“ASHRAE Guideline 0.2-2015 Commissioning Process for Existing Systems and Assemblies”
requires the following items as part of Retro-Commissioning:

 

Published:
    Read FAQ
What is required to take into consideration for the Audit Level II?

”ASHRAE Guideline 0.2-2015 Commissioning Process for Existing Systems and Assemblies” requires the following items as part of the Audit:

Published:
    Read FAQ