Skip to main content
Displaying 111 - 120 of 714 results
What does "substantially the same location" mean? How much can my new home move within my lot?

The proposed building shall be located within a maximum offset of the existing building footprint. The allowable offset shall be a maximum of 20% of the lot width and 20% of the lot depth, in the same direction as the lot width or depth, respectively.

Published:
    Read FAQ
Can projects with a basement still qualify as a like-for-like project?

Adding a new basement or enlarging an existing basement level is allowed and qualifies as an Eligible Project, provided the basement does not exceed 110% of the existing building footprint.

Published:
    Read FAQ
Can I expand my second story?

A second story that existed prior to the wildfire may be rebuilt and expanded as part of a like-for-like +10% project, so long as it complies with maximum allowable height and building footprint. 

Published:
    Read FAQ
How are "prevailing setbacks" determined?

Prevailing setbacks apply to areas with developed lots (where some homes burned down, and with some homes still standing) of varying front yard setbacks.  See

Published:
    Read FAQ
Is my rebuild project required to have rooftop solar panels?

Under the Governor's Executive Order N-29-25 issued on July 7, 2025, solar pv systems are not required.

Published:
    Read FAQ
Does my rebuild project need to comply with the current Energy Code?

Yes, the current Energy Code applies. 

Published:
    Read FAQ
Are surveys required?

Yes, surveys are required if the property lines are not clear or cannot be established in the field.

Published:
    Read FAQ
Are Geology and Soils reports required?

Geology and Soils reports are required in some geologically sensitive areas as outlined in the Information Bulletin P/BC 2025-157 Geologic and Geotechnical Considerations for Rebuilding in the Palisades Fire Area.

Published:
    Read FAQ
Is a slope-band analysis required?

A slope band analysis is not required if rebuilding as a like-for-like +10% project. Otherwise, projects within a designated hillside area will require a slope band analysis.

Published:
    Read FAQ
Can I rebuild my attached or detached garage? Does it count as part of my 110%?

Yes you can rebuild your attached or detached garage as part of a like-for-like+10% project. Each detached structure will be evaluated individually for conformance with like-for-like requirements.

Published:
    Read FAQ