Skip to main content
Displaying 341 - 350 of 714 results
When is a fire department verification required?

When the building is a title 19, A or E occupancy.

Published:
    Read FAQ
When is a fire sprinkler verification required?

When clearance for the fire sprinkler is required to process the Certificate of Occupancy.

Published:
    Read FAQ
When is a foundation inspection required?

When all forms and rebar (reinforcing bar) are in place, but before concrete is placed.

Published:
    Read FAQ
When is a HVAC verification required?

When clearance for the HVAC is required to process the CofO.

Published:
    Read FAQ
When is a Landscape Letter required?

When there is a City Planning Case requiring a landscape Architect.

Published:
    Read FAQ
When is a Plumbing Verification required?

When clearance for the plumbing is required.

Published:
    Read FAQ
When is a Reroof Certificate required?

A reroof certificate is required for existing building in which the roof is replaced or repaired.

Published:
    Read FAQ
When is a roof nailing inspection required?

When all rough sheathing is in place and nailed.

Published:
    Read FAQ
When is a rough inspection required?

When all framing is in place and electrical and plumbing installed.

Published:
    Read FAQ
Do temporary structures need to comply with DA requirements?

Disabled access requirements apply to both temporary and permanent structures.

Published:
    Read FAQ