Yes, if the installation involves a (1) communication circuit or class 2 signaling circuit over 30 volts or under 30 volts but more than 100 va, (2) amplifier circuits not using class 2 or 3 wiring, or (3) any circuit operating over 15 volts that control, generate, transmit, transform, or utilize
Fees for plan check are calculated based on items to be reviewed and permitted. You can find the breakdown of these item in sections 93.0214 through 93.0224.
How can I tell if a product is approved to be used in the City of Los Angeles?
A product (or equipment) is considered approved if it bares either the approval label of the City of Los Angeles Electrical Test Lab, or listing or certification label, symbol or other identifying mark of a recognized testing agency.
You may check the status of your plan check either through 311 or via Department's online permit and inspection report. You can reach this online service at Online Services.
The amount time needed to check a plan will vary week to week based on the day's backlog at the time of submittal. You may ask any available staff about the current backlog and a time estimate.
The fee is calculated in accordance to code section 93.0213. Each electrical component is itemized as a fee item. You may calculate the fee on our website using the Permit Fee Calculator.