Skip to main content
Displaying 91 - 100 of 714 results
What is the Pacific Palisades Undergrounding Initiative? What are the requirements for future-ready electrical service?

Please refer to LADWP Pacific Palisades Undergrounding Initiative, which provides more information, along with the requirements and steps for electric service installation.

Published:
    Read FAQ
Will other agencies need to review my plans? Do other clearances still apply?

While the Pre-Approved Standard Plan Program streamlines the building and safety review process, other agency/departmental reviews and clearances may still be required depending on your specific site conditions and type of rebuild.

Published:
    Read FAQ
Who can I contact for general Zoning and Building Code questions related to SFDs?

For Zoning and Building code questions, please contact our call center at 311 or (213) 473-3231 and ask to speak with the LADBS Zoning & Building Code Engineer. Some zoning information can also be found on ZIMAS.

Published:
    Read FAQ
For eligible projects, like-for-like, how do I measure the height of a house/structure being rebuilt if the grade has changed?

To be considered an eligible project in accordance to Emergency Executive Order 1, the rebuilt structure shall not exceed 110% of the height that existed immediately before the Wildfires:

Published:
    Read FAQ
Is Homeowner Association (HOA) approval required?

If your property is part of a Homeowners Association (HOA), your property may be subject to Covenants, Conditions, and Restrictions (CC&Rs)—private agreements that may impose development standards or conditions different from those in the current Los Angeles Zoning Code.

Published:
    Read FAQ
Is there a resource for contractor-related information and guidance?

The contractor state licensing board can provide contractor-related information. Their website can be found here: CSLB 
 

Published:
    Read FAQ
What projections are allowed to the building’s footprint and height and still be considered as an Eligible Project?

Eaves: Project into the required side yard not more than 4 inches for each foot of width of such side yard, provided the width of the side yard is not reduced to less than 30 inches. Project into the required front and rear yards not more than 30 inches.

Published:
    Read FAQ
Can I add an ADU on the second floor of my house or on the second floor of my detached garage and be considered as like-for-like?

The ADU can be added on the second floor as long as the overall resulting building height is within 110% of the existing building height.

Published:
    Read FAQ
Does the building footprint need to maintain the original shape?

The building footprint expansion and shape can be modified provided it is within 110% of the existing building footprint and is substantially in the same location.

Published:
    Read FAQ
Can I relocate my detached garage and make it a part of the main house?

Relocating an existing detached garage and incorporating it to be part of the main dwelling as an attached garage is allowed and considered as an Eligible Project.

Published:
    Read FAQ