Skip to main content
Displaying 91 - 100 of 142 results
Plan Check Guidelines for State Approved Factory-Built Housing (FBH)
IB/P/BC 2026-112
Published:
Effective Date:
       
Contents of Reports for Submittal to the LADBS Grading Division
IB/P/BC 2026-113
Published:
Effective Date:
       
Structural Monitoring Equipment in Buildings Designed with Nonlinear Response History Procedure
IB/P/BC 2026-117
Published:
Effective Date:
       
Guidelines for Storm Water Infiltration
IB/P/BC 2026-118
Published:
Effective Date:
       
Interim General Policy for Plan Check Time Extension
IB/P/BC 2026-120
Published:
Effective Date:
       
Controlled Low Strength Material (CLSM)
IB/P/BC 2026-121
Published:
Effective Date:
       
Guidelines for the Issuance of Certificates of Occupancy for Commercial or Residential Core & Shell Buildings
IB/P/BC 2023-122
Published:
Effective Date:
       
Alternative Design Procedure for Seismic Analysis and Design of Tall Buildings and Buildings Utilizing Complex Structural Systems
IB/P/BC 2026-123
Published:
Effective Date:
       
Inspection Requirements for Anchors in Concrete Supporting Fire Sprinkler Lateral Braces
IB/P/BC 2023-124
Published:
Effective Date:
       
Employment and Duties of a Registered Deputy Inspector
IB/P/BC 2023-034
Published:
Effective Date: