Skip to main content
Displaying 81 - 90 of 215 results
What projections are allowed to the building’s footprint and height and still be considered as an Eligible Project?

Eaves: Project into the required side yard not more than 4 inches for each foot of width of such side yard, provided the width of the side yard is not reduced to less than 30 inches. Project into the required front and rear yards not more than 30 inches.

Published:
    Read FAQ
Can I add an ADU on the second floor of my house or on the second floor of my detached garage and be considered as like-for-like?

The ADU can be added on the second floor as long as the overall resulting building height is within 110% of the existing building height.

Published:
    Read FAQ
Does the building footprint need to maintain the original shape?

The building footprint expansion and shape can be modified provided it is within 110% of the existing building footprint and is substantially in the same location.

Published:
    Read FAQ
Can I relocate my detached garage and make it a part of the main house?

Relocating an existing detached garage and incorporating it to be part of the main dwelling as an attached garage is allowed and considered as an Eligible Project.

Published:
    Read FAQ
Self-Certification Pilot Program
Published:
    Read More  
Emergency Executive Order No. 6 Self-Certification Pilot Program
Published:
       
Self-Certification Pilot Program Implementation Guidelines
Published:
       
When will Building & Safety start accepting applications to become a Self-Certified Professional?

Since June 9, 2025, LADBS has been accepting applications for architects using the process shown in the Implementation Guidelines.

For civil engineers, LADBS will begin accepting applications February 17, 2026.

Published:
    Read FAQ
Self-Certification - Statement Certificate of Conduct
Published:
       
Self-Certification Application
IN.App29
Published: