Skip to main content
Displaying 1751 - 1760 of 4469 results
How many sets of plans do I need at the time of filing for plan check, and at permit issuance?

At the time of filing:

Published:
    Read FAQ
Can a homeowner prepare the drawings, obtain a building permit, & construct my own house or addition, without consulting an architect/engineer/contractor?

Yes, if the house is one story and will be built from plans based on the Department standard 

Published:
    Read FAQ
How are changes to approved plans during construction handled by the department?

Generally speaking, any changes to Department-approved plans shall be approved by the plan review engineer who reviewed and issued the permit. 

Published:
    Read FAQ
What is the current status of my plan check?

Call 3-1-1 to find out the current status of your plan check.

Published:
    Read FAQ
What is an inspection?

All construction work for which a permit is required shall be subject to inspection by authorized inspectors. An inspection must be performed before work is concealed or covered. It is your responsibility to notify the inspector when the work is ready for inspection.

Published:
    Read FAQ
When do I call for an inspection?

Once you obtain a permit, you can commence with the work. However, you must call for inspection before you cover or conceal any work. If you are unsure of when to call for inspection, please contact our Customer Call Center at 3-1-1.

Published:
    Read FAQ
How do I schedule for an inspection?

When the work is ready, request an inspection using one of three options:

Published:
    Read FAQ
Can I request an inspection for tomorrow?

You can request an inspection for the next business day, as long as the request is made before 4:00 pm.

Published:
    Read FAQ
Can I request an inspection for any permit & do I need to register beforehand?

You can request an inspection for any permit, regardless of whether it was obtained at an LADBS Development Services Center or on the Internet via 

Published:
    Read FAQ
Why are there only three days available for scheduling inspections?

The automated inspection request systems allow inspections to be requested only three days in advance. Call the Customer Call Center at 3-1-1 if you need to request an inspection more than three days in advance.

Published:
    Read FAQ