How do I obtain an application form for equipment (or conductor) approval by LADBS-ETL?
There is one application form that is used for each type of submittal (New, Renewal, Technical and Clerical Modifications, for Laboratory, General, and One-time Approvals). You can obtain this form as follows:
How long does it take to obtain LADBS-ETL approval for a product?
Depending upon the labs backlog, it would take about 10 to 15 days for a lab application, and 15 to 20 days for a General Approval (Research Report) to be assigned. After assignment, it would generally take about one to two weeks to get a response.
Equipment manufacturer or equipment distributor (for general or one-time approval) and end user of the equipment (for one-time approval) can apply for equipment approval.
How long is the approval good for, and where do I find it?
The general and laboratory approval is good for 12 months. The product approval letter indicates the duration and expiration date of the approved product.
Yes. Pursuant to section 98.0422 of the Los Angeles City Municipal Code, expedite review process is available for the amount of the fee equal to one-half of the review fee, in addition to the normal review fee.
Only products that have either a Laboratory or General Approval (no one-time approvals) may be subject to annual renewal. About 60 days before an approval expires, the original applicant needs to take the following actions:
Is approved equipment or conductor required to have an approval label, and if so, how one can get one?
All equipment approved by LADBS-ETL, with some exceptions for some of the equipment that have General Approvals, are required to bear the approval label of LADBS-ETL. This approval label would be different from equipment that is approved under Laboratory or General Approval vs.