LADBS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Approved materials are published as Los Angeles Research Reports (LARR).
For licensing of product approval test labs, refer to the Materials Control section in the Inspection Bureau.
Filtered categories:
State law allows a local ADU ordinance to establish certain ADU development standards. However, these standards shall not include minimum lot size (see GC Section 65852.2(a)(1)(B)(i)). Therefore, a minimum Lot size requirement for a given zone classification shall not be the basis of a denial of a new ADU.
Was this helpful?
When submitting your Building Permit application, please indicate the ADU Standard Plan number you are using in the work description.
Was this helpful?
If your property qualifies and does not require special processing, you may apply for an epermit online. This is the fastest, easiest option.
Was this helpful?
You can visit our website for Express Permits.
Was this helpful?
Obtaining a permit online at our website LADBS.org takes only minutes.
Was this helpful?
A permit expires
1. In two years from the date of its issuance
2. If no work has been started within six months from its issuance
3. Work has started but stopped for over six months.
However, within 30 days of its expiration, an extension of time to extend a permit may be filed with the Department using either modification Request for Modification Form 41a or Request for Modification Form 42 . The request shall be filed with the inspection district supervisor if no work has been started. If the permit has expired and the work has started, the request shall be filed with any plan check office.
Was this helpful?
You can visit one of our development centers and apply for your permit in person by making the required appointment through the BuildLA system.
Was this helpful?