Custodian of Records
Anyone can initiate a request to Public Records. It may include a wide variety of documents and materials (including print, photographic, and electronic formats) that were created or obtained by the LADBS.
About the Program
The California State Legislature adopted the Public Records Act in 1968. It is designed to give the public access to information in the possession of public agencies. The Act also provides that public records shall be open for inspection during regular office hours of the agency. The public can inspect or receive a copy of any record unless the record is exempted from disclosure under the act.
Additional Resources
- FAQ
FAQ Search Results
Filtered categories:
All
For the purpose of this provision, in conjunction means when a building permit application to remove covered parking and a building permit application for the construction of an ADU on the same Lot are submitted at the same time, or where one building permit application is submitted while the other building permit application or building permit is still open and valid.
Was this helpful?
The defined passageway and space between buildings regulation does not apply to the ADU or any residential building on the same Lot during the approval or construction of an ADU, whether through a zoning review, building permit plan check or inspection. In the event that new (non-ADU) structures or additions to structures are constructed on the site subsequent to the creation of the ADU, any applicable regulations pertaining to passageways or space between buildings would apply to the new structure or addition, consistent with the Zoning Code standards in place at the time that the plan check fee for the structure or addition is paid in accordance with LAMC 13B.10.1.B.2.
Was this helpful?
No, this provision applies if either additional dwelling units or guest rooms are added to a lot after the creation of the ADU or JADU.
Was this helpful?
A JADU shall be identified as a JADU on Building Permits, Certificate of Occupancy and other pertinent City records. The addition of a JADU changes the designation of the One-Family Dwelling to a One-Family Dwelling and JADU. For purposes of any fire or life protection ordinance or regulation, a JADU shall not be considered a separate or new dwelling unit per GC 65852.22(d). However, JADUs may be counted as housing units in reports to the Department of Finance as well as for the Regional Housing Needs Assessment (RHNA) and other housing unit reporting.
Was this helpful?
Yes
Was this helpful?
Los Angeles County Tax Assessor’s records may be used to establish the square footage of the single-family dwelling for the purpose of calculating the required impact fee for the ADU.
Was this helpful?
The fee must be proportional to the average size of all dwelling units on the Lot. Floor plans showing the sizes of all units may be required to make this determination. An applicant may choose to pay the full fee in lieu of providing these plans.
Was this helpful?
Square footage, square-feet and size are used in the ADU Ordinance to refer to various direct ADU size regulations (such as the 1,200 square foot limitation). These terms refer to the definition of Floor Area in LAMC 12.03, but does not include the definition of Residential Floor Area (RFA), nor does it include any non-conditioned spaces such as porches, patios or breezeways with solid or lattice roofs. Physically connected spaces that are conditioned but do not have an interior connection to the ADU are also not counted as ADU square footage. This definition does not apply to a Movable Tiny House (MTH), which is subject to distinct size provisions as described in the definition of a MTH.
Indirect limits on ADU size through other zoning provisions such as Floor Area Ratio (including RFA in the R1, RE, RS and RA zones) or lot coverage may apply separately which may further limit allowable ADU square footage. Refer to LAMC 12.22 A.33(b) for more information on applicable development standards.
Was this helpful?
Only products that have either a Laboratory or General Approval (no one-time approvals) may be subject to annual renewal. About 60 days before an approval expires, the original applicant needs to take the following actions:
- Submit a completed renewal application form (PC-ELEC-App.12). Original signature is required.
- Submit the application fee as marked on the application form. Make check payable to “The Department of Building and Safety, City of Los Angeles.”
- Submit a current production sample of the equipment along with an explanation if there were any changes to the equipment from the previous approval.
Was this helpful?
Submit an “Application for Testing or Evaluating Mechanical Equipment” (found on the "Mechanical Test Lab (MTL)" page) to LADBS-MTL, check the box “renewal” and pay the fees.
Additional information, tests, and/or engineering analysis may be required, in which case written comments will be sent to the applicant.
Was this helpful?