Skip to main content

Mandatory Requirements Checklist Additions and Alterations to Non-Residential Buildings and Residential Buildings Over Six Stories (for 2011 Codes)

Submitted by Anonymous (not verified) on April 3, 2023
Identifier
GRN 10-2013
Attachment
/sites/default/files/efs/forms/mandatory-requirements-checklist-additions-and-alterations-to-non-residential-buildings-and-residential-buildings-over-six-stories-grn-10.pdf

Mandatory Requirements Checklist Additions and Alterations to Residential Buildings of Six Stories Or Less (for 2011 Codes)

Submitted by Anonymous (not verified) on April 3, 2023
Identifier
GRN 9-2013
Attachment
/sites/default/files/efs/forms/mandatory-requirements-checklist-additions-and-alterations-to-residential-buildings-of-six-stories-or-less-grn-9.pdf

Mandatory Requirements Checklist Newly-Constructed Non-Residential Buildings and Residential Buildings Over Six Stories (for 2011 Codes)

Submitted by Anonymous (not verified) on April 3, 2023
Identifier
GRN 5-2013
Attachment
/sites/default/files/efs/forms/mandatory-requirements-checklist-newly-constructed-non-residential-buildings-and-residential-buildings-over-six-stories-grn-5.pdf

Mandatory Requirements Checklist Newly-Constructed Residential Buildings of Six Stories or Less (for 2011 Codes)

Submitted by Anonymous (not verified) on April 3, 2023
Identifier
GRN 4-2013
Attachment
/sites/default/files/efs/forms/mandatory-requirements-checklist-newly-constructed-residential-buildings-of-six-stories-or-less-grn-4.pdf

Tier 1 and Tier 2 Voluntary Requirements Checklist Newly-Constructed Residential Buildings of Six Stories or Less (for 2011 Codes)

Submitted by Anonymous (not verified) on April 3, 2023
Identifier
GRN 4A-2012
Attachment
/sites/default/files/efs/forms/tier-1-and-tier-2-voluntary-requirements-checklist-newly-constructed-residential-buildings-of-six-stories-or-less-grn-4a.pdf

How long is a plan check application good for?

Plan check applications expire 18 months after the plan check fees are paid. However, within 30 days of its expiration, an extension of time to extend a permit application may be filed with the Department using a Request for Modification of Building Ordinances. The request may be filed with any Plan Check office, preferably with the office where the plan was reviewed. A fee shall accompany each request.

How are changes to approved plans during construction handled by the department?

Generally speaking, any changes to Department-approved plans shall be approved by the plan review engineer who reviewed and issued the permit. 

Sometimes, the changes can be handled over the counter on the same day it is brought in; other times, the changes may need to be resubmitted for further review with an additional plan review fee. In either case, it is always a good idea to first call the plan review engineer who issued the permit and ask for his/her help.