When is it required to have the ducts covered during a project?
Ducts should be covered as soon as installed, and shall remain covered until the HVAC system is installed and ready to be turned on.
Ducts should be covered as soon as installed, and shall remain covered until the HVAC system is installed and ready to be turned on.
Commissioning report is required for all new non-residential projects of 10,000 square feet or more. The exceptions are warehouses, open parking garages and similar projects.
Call for initial inspection after HVAC is installed and ducts sealed and prior to drywall installation.
Guest rooms in a hotel for sleeping purposes and any related use is considered a residential project.
Contact the designated plan checker on your project to make an appointment for verification of corrections. Contact information is provided on the correction sheet. Approval for Green Building requirements will be provided after verification of all corrections is completed.
No, the number of stories does not change the requirements of a residential or non-residential use.
Green Building code is applicable to the following projects:
No, EV charging stalls are required to be unrestricted and available for all users. However, if the EV charging infrastructure is located in a manner where it can facilitate both spaces, then it will be acceptable.