Untreated Gray Water Correction Sheet (for 2017 Codes)
Identifier
PC/MECH/Corr.Lst.107-2017
Plan check is required when the aggregate cooling or the heating in the building exceeds 500,000 BTU/hr.
Please see Section 403.7 of the Los Angeles Mechanical Code (LAMC) for the requirements concerning garage ventilation systems.
Yes, but only when the area of the open window and the distance from the window to the furthest location in the room comply with the requirements of Title 24.