When is a roof nailing inspection required?
When all rough sheathing is in place and nailed.
When is a rough inspection required?
When all framing is in place and electrical and plumbing installed.
When is a seismic gas valve required?
If the project has gas and the valuation is over $10,000.00.
When is a smoke detector inspection required?
Smoke detectors are required in all residential buildings
When is a Stormwater Observation Report required?
When required by Department of Public Works Sanitation. Please contact the Department of Public Works for more information.
When is a Structural Observation required?
When required by the provisions of section 1710.2 or 1710.3 of the LAMC.
When is a T-bar ceiling inspection required?
When all HVAC, electrical, and fire sprinkler are installed in the ceiling, but before covering.
When is an AQMD clearance required?
An AQMD clearance is required for charbroilers spray booth, dry cleaning, motor fuel storage, ETC.
When is an Energy Certificate required?
When work performed and materials used are required to comply with Title 24 Energy Regulations.
When is an insulation inspection required?
When all framing has been approved.
Who can I call for construction complaints?
Call the Customer 311 or Call Center. Alternatively, you may file a complaint through the LADBS.org website.
Who do I pay non-compliance fee to?
Non-compliance fees are paid to Financial Services,
Who enforces construction complaints?
If no permits were pulled for the project, it will investigated by Code Enforcement. If permits were pulled, then the Inspection Division investigates.
Who is my inspector?
Inspectors are assigned to a district in PCIS. You can check property activity reports on the LADBS website.
Who is my inspector's supervisor?
You can call the Customer 311 or Call Center for that information.
Will I get a certificate of occupancy on a remodel permit?
No, a CofO will only be issued if it is a change of occupancy or an increase in square footage.
Will I have to pay the CEIF fees?
Whenever an Order to Comply is issued you will be billed $336.00, plus a 6% surcharge fee.
Will I schedule the Fire Department before the Building inspector for a special event?
The Temporary Special Event (TSE) permit must be obtained then contact the Fire Department.
Will LADBS accept copies of the required forms?
Original documents are required. Copies may be accepted under special circumstances.
Will the Certificate of Occupancy be mailed to me?
Yes, the clerical staff will mail it out once the inspector issues and turn it in for filing.