Skip to main content
Displaying 2681 - 2690 of 4518 results
When is a foundation inspection required?

When all forms and rebar (reinforcing bar) are in place, but before concrete is placed.

Published:
    Read FAQ
When is a HVAC verification required?

When clearance for the HVAC is required to process the CofO.

Published:
    Read FAQ
When is a Landscape Letter required?

When there is a City Planning Case requiring a landscape Architect.

Published:
    Read FAQ
When is a Plumbing Verification required?

When clearance for the plumbing is required.

Published:
    Read FAQ
When is a Reroof Certificate required?

A reroof certificate is required for existing building in which the roof is replaced or repaired.

Published:
    Read FAQ
When is a roof nailing inspection required?

When all rough sheathing is in place and nailed.

Published:
    Read FAQ
When is a rough inspection required?

When all framing is in place and electrical and plumbing installed.

Published:
    Read FAQ
When is a seismic gas valve required?

If the project has gas and the valuation is over $10,000.00.

Published:
    Read FAQ
When is a smoke detector inspection required?

Smoke detectors are required in all residential buildings

Published:
    Read FAQ
When is a Stormwater Observation Report required?

When required by Department of Public Works Sanitation. Please contact the Department of Public Works for more information. 

Published:
    Read FAQ