How can I renew my Los Angeles City Research Report?
Complete an Application for Renewal and Clerical Modification of General Approval as directed in the instructions available at dbs.lacity.gov. The fee is listed on the application based on the type of product approval previously obtained.
What is the process to obtain a Los Angeles City Research Report for my product?
The evaluation time frame is based on the complexity of the product. Contact the Engineering Research Section for the current status. The process to obtain a Los Angeles City Research Report consists of the following steps:
I have a Los Angeles City Research Report (LARR) based on a Nationally Recognized Model Code Agency Evaluation Report. Is my Los Angeles City Research Report Approved for the Current Los Angeles City Building Code (LABC)?
Your products are approved for the Code version only listed on both the Evaluation Report and the LARR Approval Letter. If either product approval document does not list the current version of the Building Code, you will need to have these updated.
What does the “Code Date” listed on the Los Angeles Research Report mean?
The Code Date stated on a Research Report (upper right corner on first page of Research Report) identifies which Los Angeles Building Code (LABC) edition the product specified in the research report is approved for. Building projects and LARR approved products shall have the same Code Date.
What is a One-Time Approval and how do I apply for one?
Exceptions for products without proper approval are considered by the Structural Plan Check Division. See your plan checker and plan check supervisor regarding the process and fees required for an administrative approval.