Skip to main content
Displaying 2821 - 2830 of 4522 results
When do I need to call for green inspection?

Call for initial inspection after HVAC is installed and ducts sealed and prior to drywall installation.

Published:
    Read FAQ
When is a commissioning report required?

Commissioning report is required for all new non-residential projects of 10,000 square feet or more. The exceptions are warehouses, open parking garages and similar projects.

Published:
    Read FAQ
When is it required to have the ducts covered during a project?

Ducts should be covered as soon as installed, and shall remain covered until the HVAC system is installed and ready to be turned on.

Published:
    Read FAQ
Where can I find the SRI values for the most common roofing products?

The manufacturer’s website will usually have this information readily available. Alternatively, the Cool Roof Rating Council (CCRC) provides a searchable public database for all products that have been tested by the organization.

Published:
    Read FAQ
Where can I obtain a copy of the Green Building Code?

CALGreen and Los Angeles Green Building Codes are available to view on our website.

Published:
    Read FAQ
Who can prepare a commissioning report?

The report can be prepared by commissioning agents and any other trained personnel with experience on projects of comparable size and complexity.

Published:
    Read FAQ
Can I combine a kitchen exhaust with a bathroom exhaust?

Kitchen exhaust with intake from the kitchen ceiling register and bathroom exhaust can be combined using the same exhaust duct. Kitchen exhaust firm a kitchen hood shall be combined with bathroom exhaust.

Published:
    Read FAQ
Can I install a residential hood in a non-dwelling unit?

Yes, but with conditions. Residential hoods may be installed in employee kitchen areas, community centers in residential buildings, churches and similar areas that are not designed for the selling of food to the public.

Published:
    Read FAQ
Can the bathroom, kitchen and dryer exhaust terminate under the balcony?

Yes, but with conditions. Contact Mechanical Plan Check for more information.

Published:
    Read FAQ
Do I need plan check to install an air conditioning system in a single dwelling?

Plan check is required when the aggregate cooling or the heating in the building exceeds 500,000 BTU/hr.

Published:
    Read FAQ