Skip to main content
Displaying 2871 - 2880 of 4522 results
What is the fees for a special event permit?

The cost is $137.80 for a TSE permit.

Published:
    Read FAQ
What is the height of the building?

A point measured from the lowest adjacent grade to a point at the top of the building.

Published:
    Read FAQ
What is the issuance fee for a TCO?

The issuance fee is $453.00.

Published:
    Read FAQ
What is the Occupancy Load?

In A and E occupancies the occupant load is required on the CofO for the number of people allowed.

Published:
    Read FAQ
What is the price per occupancy of the TCO?

For A, E, I, H, B, the fees are $98.00 per floor and R2 occ $189.00 per floor.

Published:
    Read FAQ
What is the square footage of this building?

The measurement of the length times the width of the structure.

Published:
    Read FAQ
What is the structural inventory on the certificate of occupancy?

The structural inventory indicates the type of structure, occupancy, parking, height, length, width ETC.

Published:
    Read FAQ
What is the Type of Construction?

Type I, II, III, IV and V. See section 602 of the Los Angeles Building Code for more detailed information.

Published:
    Read FAQ
What is the Use?

Example of some uses are office, retail, restaurant, apartment, auto sales, auto repair, etc.

Published:
    Read FAQ
What type of clearances are required for CofO?

HVAC Plumbing, Electrical, Fire Sprinkler, Green, Building, Public Works, Fire Department, Sanitation.

Published:
    Read FAQ