Skip to main content
Displaying 4151 - 4160 of 4530 results
When is a Covenant and Agreement for Anti Graffiti required?

When the customer decides not to use anti graffiti coating on the first 9 feet of the exterior of the building.

Published:
    Read FAQ
When is a deputy inspector required?

When required by the engineer or indicated on the approved plans.

Published:
    Read FAQ
When is a deputy report required?

When there are higher stresses in the structural design.

Published:
    Read FAQ
When is a drywall inspection required?

When all wallboard has been installed and nailed or screwed in.

Published:
    Read FAQ
When is a electrical verification required?

When clearance for the electrical is required to process the Certificate of Occupancy.

Published:
    Read FAQ
When is a fire department verification required?

When the building is a title 19, A or E occupancy.

Published:
    Read FAQ
When is a fire sprinkler verification required?

When clearance for the fire sprinkler is required to process the Certificate of Occupancy.

Published:
    Read FAQ
When is a foundation inspection required?

When all forms and rebar (reinforcing bar) are in place, but before concrete is placed.

Published:
    Read FAQ
When is a HVAC verification required?

When clearance for the HVAC is required to process the CofO.

Published:
    Read FAQ
When is a Landscape Letter required?

When there is a City Planning Case requiring a landscape Architect.

Published:
    Read FAQ