What is inspection?

All construction work for which a permit is required shall be subject to inspection by authorized inspectors. It is your responsibility to notify the inspector when the work is ready for inspection. 

Published:
    Read FAQ
How do I schedule for inspection?

To request for inspection, please call (888) LA4Build or request for inspection online.

 

Published:
    Read FAQ
What is required to take into consideration for Retro-Commissioning?

“ASHRAE Guideline 0.2-2015 Commissioning Process for Existing Systems and Assemblies”
requires the following items as part of Retro-Commissioning:

 

Published:
    Read FAQ
What is required to take into consideration for the Audit Level II?

”ASHRAE Guideline 0.2-2015 Commissioning Process for Existing Systems and Assemblies” requires the following items as part of the Audit:

Published:
    Read FAQ
Are DA requirements applicable to an apartment remodel project?

Remodeling of apartment buildings that were first occupied prior to March 13, 1991, are not subject to DA requirements.

Published:
    Read FAQ
Are door installations allowed on the accessible shower compartment?

Yes, as long as it does not obstruct controls, faucets, and shower spray units, or the transfer of an individual from wheelchairs onto shower seats.

Published:
    Read FAQ
Do employee work stations/areas need to be accessible?

Employee workstations must be on an accessible route.

Published:
    Read FAQ
Are grab bar installations required inside the dwelling unit's bathroom?

No, but backing for future installation of grab bars is required.

Published:
    Read FAQ
Are handrails required on both sides of a ramp?

Yes. Per 11B-505.4, handrail height must be a minimum of 34" and maximum of 38" measured vertically.

Published:
    Read FAQ
Do outdoor dining areas require DA seating?

Yes, DA seating is required for each functional area.

Published:
    Read FAQ