Building Inspections
The Building Inspection Division provides inspection services for all commercial, industrial and residential buildings over two units. Inspections are performed on all integral, non-mechanical, components including the zoning of buildings.
Additional Resources
- Code Amendment
- Inspection Forms
- Requests for Modifications
Filtered categories:
Covenant and Agreement to Hold Property as One Parcel (Lot Tie Affidavit) (for 2011 Codes)
PC/STR/Aff22-2009
Covenant and Agreement to Provide Parking Attendant (for 2011 Codes)
PC/STR/Aff31-2008
Covid-19 - Emergency Tolling of Deadlines Related to Expiration of Permits and Related Documents
IB/P/GI 2023-033
- Effective
Crack Repair of Unreinforced Masonry Walls with Grout Injection
IB/P/BC 2023-056
- Effective
Cutting, Notching, and Boring of Wood Framing Members
IB/P/BC 2020-007
- Effective
Data Collection, Material Testing and Condition Assessment Requirements for Existing Concrete Buildings
IB/P/BC 2020-153
- Effective
DE ELEVADOR DEL SILLA DE RUEDAS
In/EPV/Form.008 Wheelchair Lift Mechanics
Definition of "Commenced Construction" and Similar Phrases
IB/P/G1 2023-016
- Effective
Filtered categories:
Covenant and Agreement to Hold Property as One Parcel (Lot Tie Affidavit) (for 2011 Codes)
PC/STR/Aff22-2009
Covenant and Agreement to Provide Parking Attendant (for 2011 Codes)
PC/STR/Aff31-2008
Covid-19 - Emergency Tolling of Deadlines Related to Expiration of Permits and Related Documents
IB/P/GI 2023-033
- Effective
Crack Repair of Unreinforced Masonry Walls with Grout Injection
IB/P/BC 2023-056
- Effective
Cutting, Notching, and Boring of Wood Framing Members
IB/P/BC 2020-007
- Effective
Data Collection, Material Testing and Condition Assessment Requirements for Existing Concrete Buildings
IB/P/BC 2020-153
- Effective
DE ELEVADOR DEL SILLA DE RUEDAS
In/EPV/Form.008 Wheelchair Lift Mechanics
Definition of "Commenced Construction" and Similar Phrases
IB/P/G1 2023-016
- Effective