Electrical Inspections
An electrical inspection provides inspection services for all commercial and industrial buildings, and verifies compliance with the electrical code.
About Inspection
The intent of electrical inspection is to ensure compliance with the applicable electrical code in order to reduce personal, and structural electrical hazards.
Also, the inspector ensures that the correct product or equipment has been selected for the job, and verifies the proper installation and compliance with the Departmental approved plans, if applicable.
Additional Resources
- Code Amendment
- Inspection Forms
- Electrical Test Labs
Filtered categories:
Covenant and Agreement to Hold Property as One Parcel (Lot Tie Affidavit) (for 2011 Codes)
PC/STR/Aff22-2009
Covenant and Agreement to Provide Parking Attendant (for 2011 Codes)
PC/STR/Aff31-2008
Covid-19 - Emergency Tolling of Deadlines Related to Expiration of Permits and Related Documents
IB/P/GI 2023-033
- Effective
Crack Repair of Unreinforced Masonry Walls with Grout Injection
IB/P/BC 2023-056
- Effective
Cutting, Notching, and Boring of Wood Framing Members
IB/P/BC 2020-007
- Effective
Data Collection, Material Testing and Condition Assessment Requirements for Existing Concrete Buildings
IB/P/BC 2020-153
- Effective
DE ELEVADOR DEL SILLA DE RUEDAS
In/EPV/Form.008 Wheelchair Lift Mechanics
Definition of "Commenced Construction" and Similar Phrases
IB/P/G1 2023-016
- Effective
Filtered categories:
Covenant and Agreement to Hold Property as One Parcel (Lot Tie Affidavit) (for 2011 Codes)
PC/STR/Aff22-2009
Covenant and Agreement to Provide Parking Attendant (for 2011 Codes)
PC/STR/Aff31-2008
Covid-19 - Emergency Tolling of Deadlines Related to Expiration of Permits and Related Documents
IB/P/GI 2023-033
- Effective
Crack Repair of Unreinforced Masonry Walls with Grout Injection
IB/P/BC 2023-056
- Effective
Cutting, Notching, and Boring of Wood Framing Members
IB/P/BC 2020-007
- Effective
Data Collection, Material Testing and Condition Assessment Requirements for Existing Concrete Buildings
IB/P/BC 2020-153
- Effective
DE ELEVADOR DEL SILLA DE RUEDAS
In/EPV/Form.008 Wheelchair Lift Mechanics
Definition of "Commenced Construction" and Similar Phrases
IB/P/G1 2023-016
- Effective
Filtered categories:
Covenant and Agreement to Hold Property as One Parcel (Lot Tie Affidavit) (for 2011 Codes)
PC/STR/Aff22-2009
Covenant and Agreement to Provide Parking Attendant (for 2011 Codes)
PC/STR/Aff31-2008
Covid-19 - Emergency Tolling of Deadlines Related to Expiration of Permits and Related Documents
IB/P/GI 2023-033
- Effective
Crack Repair of Unreinforced Masonry Walls with Grout Injection
IB/P/BC 2023-056
- Effective
Cutting, Notching, and Boring of Wood Framing Members
IB/P/BC 2020-007
- Effective
Data Collection, Material Testing and Condition Assessment Requirements for Existing Concrete Buildings
IB/P/BC 2020-153
- Effective
DE ELEVADOR DEL SILLA DE RUEDAS
In/EPV/Form.008 Wheelchair Lift Mechanics
Definition of "Commenced Construction" and Similar Phrases
IB/P/G1 2023-016
- Effective