Electrical Inspections
An electrical inspection provides inspection services for all commercial and industrial buildings, and verifies compliance with the electrical code.
About Inspection
The intent of electrical inspection is to ensure compliance with the applicable electrical code in order to reduce personal, and structural electrical hazards.
Also, the inspector ensures that the correct product or equipment has been selected for the job, and verifies the proper installation and compliance with the Departmental approved plans, if applicable.
Additional Resources
- Code Amendment
- Inspection Forms
- Electrical Test Labs
Filtered categories:
GREEN BUILDING CODE PLAN CHECK NOTES RESIDENTIAL BUILDINGS
GRN 14-2023
- Effective
Green Building Code Plan Check Notes: Non-Residential Buildings
GRN 15-2020
Green Building Code Plan Check Notes Non-Residential Buildings
GRN 15-2026
Plumbing Fixture Flow Rate Tables (Residential) (for 2011 Codes)
GRN 16-2013
Filtered categories:
GREEN BUILDING CODE PLAN CHECK NOTES RESIDENTIAL BUILDINGS
GRN 14-2023
- Effective
Green Building Code Plan Check Notes: Non-Residential Buildings
GRN 15-2020
Green Building Code Plan Check Notes Non-Residential Buildings
GRN 15-2026
Plumbing Fixture Flow Rate Tables (Residential) (for 2011 Codes)
GRN 16-2013
Filtered categories:
GRN 24 Functional Performance Testing Compliance Form
PCF-GRN-2026-024
- Effective
GRN 25 Documentation and Training Compliance Form
PCF-GRN-2026-025
- Effective
GRN 26 Commissioning Report Compliance Form
PCF-GRN-2026-026
- Effective
GRN 2 VOC Content Verification Checklist
PCF-GRN-2026-002
- Effective
GRN 3 Formaldehyde Emissions Verification Checklist
PCF-GRN-2026-003
- Effective
GRN 4 Mandatory Requirements Checklist for Newly Constructed Residential Buildings
PCF-GRN-2026-004
- Effective
GRN 5 Mandatory Requirements Checklist Newly Constructed Non-Residential Buildings
PCF-GRN-2026-005
- Effective
GRN 9 Mandatory Requirements Checklist for Additions and Alterations to Residential Buildings
PCF-GRN-2026-009
- Effective
Guardrail Requirements Adjacent to Openable Windows
IB/P/BC 2023-105
- Effective