Electrical Inspections
An electrical inspection provides inspection services for all commercial and industrial buildings, and verifies compliance with the electrical code.
About Inspection
The intent of electrical inspection is to ensure compliance with the applicable electrical code in order to reduce personal, and structural electrical hazards.
Also, the inspector ensures that the correct product or equipment has been selected for the job, and verifies the proper installation and compliance with the Departmental approved plans, if applicable.
Additional Resources
- Code Amendment
- Inspection Forms
- Electrical Test Labs
Filtered categories:
Application Package for Electrical Equipment Testing Evaluation and Approval
PC/ELEC/App12-2017
Supplemental Correction Sheet for Solar Photovoltaic Systems (ELEC)
PC/ELEC/Corr.Lst.08-2016
City of Los Angeles Electrical Plan Check Correction List
PC/ELEC/Corr.Lst.08-2017
City of Los Angeles Electrical Plan Check Correction List 2020
PC/ELEC/Corr.Lst.08-2020
City of Los Angeles Electrical Plan Check Correction List 2023
PC/ELEC/Corr.Lst.08-2023
Supplemental Correction Sheet for Solar Photovoltaic Systems (for 2011 Codes)
PC/ELEC/Corr.Lst.111-2009
Supplemental Correction Sheet for Solar Photovoltaic Systems (ELEC)
PC/ELEC/Corr.Lst.111-2014
Supplemental Correction Sheet for Electrical Fire Pump System (for 2011 Codes)
PC/ELEC/Corr.Lst.24-2009
Supplemental Correction Sheet for Electrical Fire Pump System
PC/ELEC/Corr.Lst.24-2016
Filtered categories:
Application Package for Electrical Equipment Testing Evaluation and Approval
PC/ELEC/App12-2017
Supplemental Correction Sheet for Solar Photovoltaic Systems (ELEC)
PC/ELEC/Corr.Lst.08-2016
City of Los Angeles Electrical Plan Check Correction List
PC/ELEC/Corr.Lst.08-2017
City of Los Angeles Electrical Plan Check Correction List 2020
PC/ELEC/Corr.Lst.08-2020
City of Los Angeles Electrical Plan Check Correction List 2023
PC/ELEC/Corr.Lst.08-2023
Supplemental Correction Sheet for Solar Photovoltaic Systems (for 2011 Codes)
PC/ELEC/Corr.Lst.111-2009
Supplemental Correction Sheet for Solar Photovoltaic Systems (ELEC)
PC/ELEC/Corr.Lst.111-2014
Supplemental Correction Sheet for Electrical Fire Pump System (for 2011 Codes)
PC/ELEC/Corr.Lst.24-2009
Supplemental Correction Sheet for Electrical Fire Pump System
PC/ELEC/Corr.Lst.24-2016
Filtered categories:
Request to Review Local Enforcement Agency Facility Files (for public)
Requirements for Changing the Use of Existing Building
IB/P/GI 2026-021
- Effective
Residential Accessibility Plan Check Correction List
PC/DAD/Corr.Lst.11-2020
Residential Mandatory Measures for Additions and Alterations
PC/GRN/Corr.Lst.03-2026
- Effective