Electrical Inspections
An electrical inspection provides inspection services for all commercial and industrial buildings, and verifies compliance with the electrical code.
About Inspection
The intent of electrical inspection is to ensure compliance with the applicable electrical code in order to reduce personal, and structural electrical hazards.
Also, the inspector ensures that the correct product or equipment has been selected for the job, and verifies the proper installation and compliance with the Departmental approved plans, if applicable.
Additional Resources
- Code Amendment
- Inspection Forms
- Electrical Test Labs
Filtered categories:
Supplemental Correction Sheet for Methane Mitigation Systems - Mechanical (for 2011 Codes)
PC/MECH/Corr57-2011
Supplemental Correction Sheets for Garage Ventilation System (for 2026 Codes)
PC/MECH/Corr.Lst.029-2026
- Effective
City of L.A. Plumbing Plan Check Correction List
PC/MECH/Corr.Lst.106-2026
- Effective
Plan Check Correction Sheet for Non-potable Rainwater Catchment System (2023)
PC/MECH/Corr.Lst.109-2023
- Effective
Plan Check Correction Sheet for Plumbing Systems (2023)
PC/MECH/Corr.Lst.111-2023
Plan Check Correction Sheet for Methane Mitigation Systems (2023)
PC/MECH/Corr.Lst.112-2023
Plan Check Correction Sheet for Non-potable Water Reuse (2023)
PC/MECH/Corr.Lst.113-2023
Plan Check Correction Sheet for On-Site Treated Gray Water (2023)
PC/MECH/Corr.Lst.115-2023
Plan Check Correction Sheet for Untreated Gray Water (2023)
PC/MECH/Corr.Lst.116-2023
Plan Check Correction Sheet for Sewage Ejectors & Sump Pumps (2023)
PC/MECH/Corr.Lst.117-2023
Filtered categories:
Supplemental Correction Sheet for Methane Mitigation Systems - Mechanical (for 2011 Codes)
PC/MECH/Corr57-2011
Supplemental Correction Sheets for Garage Ventilation System (for 2026 Codes)
PC/MECH/Corr.Lst.029-2026
- Effective
City of L.A. Plumbing Plan Check Correction List
PC/MECH/Corr.Lst.106-2026
- Effective
Plan Check Correction Sheet for Non-potable Rainwater Catchment System (2023)
PC/MECH/Corr.Lst.109-2023
- Effective
Plan Check Correction Sheet for Plumbing Systems (2023)
PC/MECH/Corr.Lst.111-2023
Plan Check Correction Sheet for Methane Mitigation Systems (2023)
PC/MECH/Corr.Lst.112-2023
Plan Check Correction Sheet for Non-potable Water Reuse (2023)
PC/MECH/Corr.Lst.113-2023
Plan Check Correction Sheet for On-Site Treated Gray Water (2023)
PC/MECH/Corr.Lst.115-2023
Plan Check Correction Sheet for Untreated Gray Water (2023)
PC/MECH/Corr.Lst.116-2023
Plan Check Correction Sheet for Sewage Ejectors & Sump Pumps (2023)
PC/MECH/Corr.Lst.117-2023
Filtered categories:
Supplemental Correction Sheet for LA Residential Code Prescriptive Design (for 2011 Codes)
PC/STR/Corr.Lst.20B-2011
Supplemental Correction Sheet for Mansionization Ordinance (for 2011 Codes)
PC/STR/Corr.Lst.106-2011
Supplemental Correction Sheet For Mass Timber (2023 LABC)
PC/STR/Corr.Lst.115-2023
Supplemental Correction Sheet for Methane Mitigation Systems (Electrical)
PC/ELEC/Corr.Lst.56-2017
Supplemental Correction Sheet for Methane Mitigation Systems - Electrical (for 2011 Codes)
PC/ELEC/Corr.Lst.56-2011
Supplemental Correction Sheet for Methane Mitigation Systems - Mechanical (for 2011 Codes)
PC/MECH/Corr57-2011
Supplemental Correction Sheet for Prestress Concrete (for 2011 Codes)
PC/STR/Corr.Lst.43-2010
Supplemental Correction Sheet for Solar Photovoltaic Systems (ELEC)
PC/ELEC/Corr.Lst.111-2014
Supplemental Correction Sheet for Solar Photovoltaic Systems (ELEC)
PC/ELEC/Corr.Lst.08-2016
Supplemental Correction Sheet for Solar Photovoltaic Systems (for 2011 Codes)
PC/ELEC/Corr.Lst.111-2009