Adaptive Reuse Projects
Adaptive Reuse refers to the process of reusing an old site or building for a purpose other than which it was built or designed for.
About Adaptive Reuse
The City’s Adaptive Reuse Program works by streamlining the process developers must follow to get their projects approved, resulting in substantial time saving.
"The City’s Adaptive Reuse Program's first component, a set of land use ordinances, relaxes parking, density, and other typical zoning requirements. Through fire and life safety measures, the Program’s second component provides flexibility in the approval and permitting process." (excerpt from the City of Los Angeles Adaptive Reuse Program book)
Additional Resources
- Related Documents
Filtered categories:
Supplemental Correction Sheets for Methane Mitigation Systems
PC/MECH/Corr.Lst.57-2020
Supplemental Correction Sheets for Pump Systems (Domestic or Fire)
PC/MECH/Corr.Lst.30-2020
Supplemental Correction Sheets for Pump Systems (Domestic or Fire) (2017 LAPC & 2016 NFPA-20)
PC/MECH/Corr.Lst.30-2017
Supplemental Correction Sheets for Sewage Ejectors & Sump Pumps
PC/MECH/Corr.Lst.31-2020
Supplemental Correction Sheets for Sewage Ejectors & Sump Pumps (for 2011 Codes)
PC/MECH/2011
Supplemental Correction Sheets for Sewage Ejectors & Sump Pumps (for 2017 Codes)
PC/MECH/Corr.Lst.31-2017
Supplemental Plan Check Correction Sheet for 2020 Building Energy Standards (2019 California Code of Regulations Title 24, Part 6)
PC/STR/Corr.Lst.102-2020
Supplemental Plan Check Correction Sheet for Bicycle parking Ordinance (Ordinance 182,386 & 185,430)
PC/STR/Corr.Lst.111-2020
Supplemental Plan Check Correction Sheet for Bicycle Parking Ordinance (Ordinance 182,386 & 185,480)
PC/STR/Corr.Lst.111-2023
Supplemental Plan Check Correction Sheet for Concrete Special Moment Resist Frame (2023 LABC)
PC/STR/Corr.Lst.035-2023