Adaptive Reuse Projects
Adaptive Reuse refers to the process of reusing an old site or building for a purpose other than which it was built or designed for.
About Adaptive Reuse
The City’s Adaptive Reuse Program works by streamlining the process developers must follow to get their projects approved, resulting in substantial time saving.
"The City’s Adaptive Reuse Program's first component, a set of land use ordinances, relaxes parking, density, and other typical zoning requirements. Through fire and life safety measures, the Program’s second component provides flexibility in the approval and permitting process." (excerpt from the City of Los Angeles Adaptive Reuse Program book)
Additional Resources
- Related Documents
Filtered categories:
Safety Test - Cabled Elevators Installed After October 25, 1998 One Year (Group III and IV)
IN/EPV/Form02-2016
Safety Test - Cabled Elevators Installed After October 25, 1998 Five Year (Group III and IV)
IN/EPV/Form03-2016
Hydraulic Test - Elevators Installed Prior to October 25, 1998 Five Year (Group II)
IN/EPV/Form04-2016
Hydraulic Test - Elevators Installed After October 25, 1998 One and Five Year (Group III and IV)
IN/EPV/Form05-2016
FORMULARIO DE INFORME DE OBSERVACIÓN ESTRUCTURAL
IN/Form.008 Structural Observation Report Form
CERTIFICADO DE CUMPLIMIENTO DEL ARQUITECTO O INGENIERO
IN/Form.009 Architect's or Engineer's Certificate of Compliance
CERTIFICADO DE BUEN ESTADO DE ALFOMBRA
IN/Form.010 Carpet Sound Certificate
INFORME DE INSPECCIÓN ANUAL DE PRESIÓN DE RECIPIENTE
IN/Form.021 Annual Pressure Vessel Inspection Report