Building Research Section (BRS)
The BRS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Additional Information
Approved materials are published as Los Angeles Research Reports (LARR).
The Building Research Section is located at our Metro location (201 N Figueroa St, Rm 880, Los Angeles, CA 90012)
LA Research Reports (LARR)
LADBS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Approved materials are published as Los Angeles Research Reports (LARR).
Additional Resources
- FAQ
- Applications
- Publications
FAQ Search Results
Filtered categories:
All
Can I cancel, reschedule or correct an inspection requested through the internet?
No, Contact Us at 3-1-1 for assistance.
Can I change my email address for my ePlanLA account?
No, you may not change your email. The email provided at registration serves as your account name.
Can I combine a kitchen exhaust with a bathroom exhaust?
Kitchen exhaust with intake from the kitchen ceiling register and bathroom exhaust can be combined using the same exhaust duct. Kitchen exhaust firm a kitchen hood shall be combined with bathroom exhaust.
Can I combine emergency drains with subsoil drainage system?
Yes. However, the emergency drains shall be protected against backflow with backwater valves.
Can I construct a permeable pavement at my property to infiltrate stormwater?
Yes, for passive (non-concentrated) infiltration only. Where concentrated infiltration is proposed please refer to the Guidelines for Storm Water Infiltration Information Bulletin.
Can I discharge water from the sprinkler piping to the storm drain system?
No, water from sprinkler drain shall discharge to the sewer.
Can I expedite the review process?
Expedite fee pursuant to Section 98.0433 of the Los Angeles City Municipal Code may be paid by the applicant to reduce the time it takes to assign the application to an LADBS-MTL engineer. The amount of the expedite fee is, in addition to the regular application fee, equal to one-half of the regular application fee.
Can I expedite the review process?
Yes. Pursuant to section 98.0422 of the Los Angeles City Municipal Code, expedite review process is available for the amount of the fee equal to one-half of the review fee, in addition to the normal review fee.
Can I further expedite the review of a report?
Not usually. However, further expediting supplemental reports for projects under construction can be considered. It’s recommended to discuss with the grading division reviewers at the time of submittal.
Can I get a copy of a GPI report?
Yes. A completed GPI report may be obtained from the Records Section or Grading Division.
Filtered categories:
Filtered categories: